Home | Site Map | Français
No current news.
Location: Mount Wright, Quebec
Client: ArcelorMittal
In 2005, H.J. O`Connell was awarded the contract to raise and lengthen the Hesse 4 Tailings Confinement Dam. This contract was a part of the overall tailings confinement project in Mt. Wright, QC, of which H.J. O`Connell has been involved with since 1981.The project involved the construction of an impervious glacial till core dam and the construction of an emergency spillway. The 350 m long dam...

Resources

H.J. O'Connell operates a modern fleet of over 300 pieces of mining and construction equipment.

The firm has recently made additions to its fleet including: hydraulic excavators and off highway trucks, which are among the largest owned by any Canadian contractor. This productive fleet is capable of moving in excess of 4,000,000 tonnes of material per month on any particular project.

The company maintains its full range of earthmoving equipment using the latest in equipment management techniques including a very sophisticated computerized preventive maintenance program. Clients are thereby assured of consistently reliable performance.


Share