Location: Port Cartier, Quebec
Client: ArcelorMittal
In 2005, LECQ was awarded the marine contract to provide rock stabilization to the existing steel sheet pile cells located at Port Cartier, QC. The purpose of the project was to enclose the existing cells and provide stabilization and protection to the deteriorating structure. The work consisted of quarry development, blasting, sorting, hauling and placement of rockfill and armour stone. The...